Tatyoon

In August 1989 Tatyoon still had a platform, a loop and a siding, and a goods shed. There were also the ubiquitous silos found through out that district. Today the station building is still there, but not the platform, and the goods shed is demolished. It appears that the images below were captured just after the station building was refurbished. All in all, not much has change except for the track gauge, as can be seen from more recent shots linked below:

Other images and history for Tatyoon can be found at  Vicrail Stations ,  RailGeelong and Vicsig

Tatyoon VIC
Australia